Project Overview
Boulder Stone Mart Pvt. Ltd., one of India’s few private coal-mine owners, operates an open-cast coal mine in Guttitoria, Narsinghpur district (Madhya Pradesh). The mine’s overburden consists primarily of hard sandstone with compressive strength ranging from 70–100 MPa. Although the rock is hard, natural fracture patterns make it suitable for high-frequency ripping using an Xcentric Ripper.
To overcome escalating blasting challenges, particularly complaints from nearby villages and the increasing cost of scaled-down blasting patterns, the mine sought a high-productivity, low-disturbance alternative. This led to the deployment of two units of XR-50 Xcentric Rippers mounted on Hitachi 490 excavators, operated by the mining contractor Srinivas Infrastructures.
Performance Results
Each XR-50 unit was able to achieve an average of:
• 1,200 m³ of sandstone overburden removed per 20 operating hours
With two units, total production reaches 2,400 m³ per 20 hours
Performance has remained consistent over four months of operation, prompting the decision to add a third XR-50 to the project.
Why XR-50 Was Selected
Rock Hardness Requires High Impact Energy. According to Mr. Reddy, Managing Director at Srinivas Infrastructures: “For this hardness of sandstone (70–100 MPa), you need a bigger machine like the XR-50. Smaller models such as XR-30 or XR-40 do not provide enough impact energy to consistently break this material.”
The XR-50’s higher energy input and heavier structural design allow it to penetrate fractured sandstone efficiently, delivering better fragmentation and faster cycle times compared to smaller rippers.
Alternative to Blasting. Before adopting Xcentric rippers, the mine relied on conventional blasting. However:
• A nearby village raised vibration and safety complaints
• Blasting had to be scaled down into smaller blasts, increasing cost per cubic metre
• Even with smaller blasts, community objections persisted
The Xcentric Ripper resolved these issues by eliminating vibration, lowering operational cost, and enabling continuous production without blast scheduling delays.
Contractor Background – Srinivas Infrastructures
Srinivas Infrastructures is a long-term user of Xcentric Ripper technology:
• First ripper purchased in 2018
• Fleet expanded to 15 rippers across three associated companies
• With the upcoming unit for Boulder Stone Mart, the fleet will grow to 16
Their accumulated experience allows them to deploy the right ripper model for different geology. For this project’s hardness range, XR-50 is identified as the minimum viable size for productivity and reliability.
Outcome
After four months of continuous performance:
• Exceeded production targets have been exceeded
• Proven equipment reliability under hard-rock conditions
• Minimised community disturbance
This case demonstrates that the use of Xcentric Ripper is a cost-effective, safe, and high-output alternative for overburden removal in fractured hard rock formations where blasting is restricted or inefficient.
Back to InsightsRelated Insights
Transforming Overburden Removal at Balram, Talcher Coalfields with Xcentric Ripper
Key Operational Challenges The Balram Open Cast Project in Odisha’s Talcher coalfield faced a significant challenge: removing large […]
Learn more
Xcentric Ripper XR-40 Deployed for Vizag Steel Reservoir Project in Andhra Pradesh
Another Xcentric XR-40 has been successfully commissioned in India, joining two existing XR-30 units on a major excavation […]