Fractum Breaker Success Story: Chilean Copper Mines

Two major Chilean copper mines replaced their traditional rock breakers with Fractum’s innovative technology, achieving remarkable results in both pit operations and stockpile management.

The Challenge

Both mines needed to break oversized rocks down to manageable sizes (600-800mm) for processing. They were using conventional Atlas Copco rock breakers with large excavators, which proved costly and slow.

The Solution

Fractum Model 100V breaker was deployed along with smaller, more efficient excavators. At Pelambres mine, the system prevented secondary blasting in the pit. At El Soldado, it streamlined stockpile operations.

Outstanding Results

The improvements were dramatic:

  • 40% reduction in operational costs at Pelambres
  • 2-3x capacity increase in breaking operations
  • At El Soldado: throughput jumped from 100 to 350 tons per hour
  • 64% cost savings per ton processed
  • 33% faster project completion times
Why It Works

Fractum breaker’s superior efficiency allows mines to organize work more effectively. By adding a smaller excavator for material handling, the breaking operation runs continuously at peak capacity rather than stopping for loading and positioning.

These results demonstrate how innovative technology can transform mining operations, delivering significant cost savings while dramatically improving productivity.

Back to Insights

Download full case study

Contact us for your rock breaking, mining and tunnelling needs today!